8 Inch A403 Pressure Pipe Applications Socket Welded Stainless Steel Fittings

8 INCH A403 Pressure piping application Socket welded SS Fittings1.Pipe Fittings Technical Parameters1.Pipe Bend Technical ParametersBENDS SPECIFICATION REQUIREMENTS GENERAL DESCRIPTIONOutside Diameter1/2" to 100"  ThicknessSCH20, SCH30, SCH40,&nb

Featured Products

8 INCH A403 Pressure piping application Socket welded SS Fittings
1.Pipe Fittings Technical Parameters
1.Pipe Bend Technical Parameters
BENDS SPECIFICATION REQUIREMENTS 
GENERAL DESCRIPTION
Outside Diameter1/2" to 100"  
ThicknessSCH20, SCH30, SCH40, STD, SCH80, SCH100. SCH120, SCH160. XXS
Design Life30 Years
Pipeline Design CodeASME B16.49/ MSS-SP75
Service FluidFull Well Stream, Offshore Shallow Water Application, 
Subject to Potential Late Souring and 
Eventual Bacteria induced Corrosion.
Third Party InspectionRequired (Upon agreement with COMPANY. 
Mechanical tests to be witnessed) 
MOTHER PIPE REQUIREMENTS
MaterialCarbon Steel
GradeAPI 5L -  Gr.B/X42/X46/X52/X60/X70 etc.(PSL1 & PSL2)
ISO 3183- L245/L290/L320/L360/L415/L485(PSL1)
ISO 3183- L245N/L245R/L290Q/L360Q/L415Q/L485Q(PSL2)
(Seamless)
SpecificationAPI 5L: ISO 3183: 2007
Chemical CompositionAPI 5L: ISO 3183: 2007, Sour Tests Cab Be Chosed.  
Charpy Impact TestRequired, per API 5L: ISO 3183: 2007,  ASTM A370
Hardness TestRequired, per API 5L
Hydro-testRequired, per API 5L
Packing:Standard Export Packaging or As Per Customer's Requirement.
BEND REQUIREMENTS
SpecificationAPI 5L: ISO 3183: 2007
Charpy Impact TestRequired, per  API 5L: ISO 3183: 2007 MSS SP75
Hardness TestRequired, per   API 5L: ISO 3183: 2007 MSS SP75
Dimensional Tolerance+/-1 degree 
External Surface Treatment3-Layers Polyethylene  /  Fusion Bonded Epoxy (FBE)
Number of Qualification BendsPer section  API 5L: ISO 3183
MarkingPer  API 5L: ISO 3183


Other Material and Sizes Are Available If You Are Interested to Buy Pipe Fitting so Please Feel Free and Send Inquiry to Us for More Details.
2.Pipe Bend Showcase

3.Pipe Bend Inspection

4.Pipe Bend Packing and Transportation



Please contact me without any hesitition if you have any problems of our products !
We will offer warm-hearted service to you ! 
 
  
  
  
  
 
  
  
 
 
  
  
  
  
  
  
  
2.Our Service
Our Services
1.Custom product
2.Fastest leading time
3.24 hours service
4.Provide free samples
5.Ensure the reliable quality
3.FAQ
Q:What is the material of your products?
A:Our company is specialized in stainless products and metal products,we also can choose material as customer's requirement.
 
Q:What about your standard delivery date?
A:Normally the delivery time is 20-25 days .For some special case,we can make it within two weeks
 
Q:Is there any discount?
A:Sure,different quantity will have different discount.
 
Q: Can I Have Samples?
A:Yes, we can make samples to you,please contact us for details.
 
Chengdu Derbo Steel focus on steel pipe and tube for project application for more than 10 years
with good quality and reasonable price,has succeed to cooperated with Sheel.Lukoi and other
famous oil&gas companies.
If you have any inquiry,please don't hesitation to contact us,we will provide you the most competitive
price and technical support.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours